(Go: >> BACK << -|- >> HOME <<)

Jump to content

User:Durian Farmer/sandbox

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Durian Farmer (talk | contribs) at 12:25, 23 August 2023. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Tung Chung line extension
東涌綫延綫
Overview
StatusUnder Construction
LocaleTung Chung, Lantau Island
Termini
Stations2 (1 infill)
WebsiteOfficial website
Service
TypeRapid transit
SystemMTR
Operator(s)MTR Corporation
Depot(s)Siu Ho Wan
History
Planned opening2029 (2029)
Technical
Track length1.3 km (0.81 mi)
Number of tracks2
CharacterAt grade (Tung Chung and Tung Chung East)
Underground (between Tung Chung West and Tung Chung)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (overhead lines)
SignallingSACEM[1]
  1. ^ "ALSTOM SA: Alstom to provide signalling system for Hong Kong's Lantau Extension project". Alstom SA. Yahoo! Finance. 2023-03-28.