This document summarizes a proposed waste heat recovery plant project at DG Cement's Khairpur site in Chakwal, Pakistan. The project involves installing a Kalina cycle-based waste heat recovery system with three heat recovery vapor generators (HRVGs) totaling 83 tonnes per hour and one 8.6 MW vapor turbo generator. The HRVGs will be installed at the preheater and air quenched cooler ends of the cement kiln. The project is expected to generate 61,301 MWh/year of electricity, displacing grid imports and reducing annual CO2 emissions by 28,542 tonnes. It will contribute to sustainable development through environmental, social and economic benefits.